Rail King SD60 Operator's Manual

Browse online or download Operator's Manual for Engine Rail King SD60. Rail King SD60 Operator`s manual [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 23
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Rail King Scale SD60
Diesel Engine
OPERATOR’S MANUAL
(3V PS-2)
Compatibility
This engine will operate on any
traditional O-31 Gauge track system,
including M.T.H.’s RealTrax® or
ScaleTrax™ or traditional tubular
track. It is also compatible with most
standard AC transformers. (See page
22 for a complete list of compatible
transformers and wiring instructions.)
PLEASE READ BEFORE USE AND SAVE
Page view 0
1 2 3 4 5 6 ... 22 23

Summary of Contents

Page 1 - Diesel Engine

Rail King Scale SD60 Diesel EngineOPERATOR’S MANUAL(3V PS-2)CompatibilityThis engine will operate on any traditional O-31 Gauge track system, includin

Page 2 - Table of Contents

RKS SD60 Diesel Engine with PS-210Reset to Factory Defaults:To override the settings you currently have assigned to the engine and reset it to its fac

Page 3 - Set Up Checklist

MaintenanceLubricating and Greasing InstructionsThe engine should be well oiled and greased in order to run properly.Regularly lubricate all axles and

Page 4 - Priming the Smoke Unit

5. After repeating the procedure for the other motor, reassemble the chassis and body, being careful that the wire harnesses are not caught between th

Page 5 - Basic Operation

Traction Tire Replacement InstructionsYour locomotive is equipped with two neoprene rubber traction tires on each powered truck block. While these ti

Page 6 - Manual Volume Control

Locomotive Light Bulb ReplacementTo replace the burned out light bulbs on this locomotive, follow these instructions.Follow the cab removal instructio

Page 7 - Freight Yard Sounds (FYS) or

· Leave the engine in neutral with track voltage at 10-12 volts for 6-7 hours so the battery can fully recharge (if your engine has a smoke unit, be s

Page 8 - Proto-Coupler Operation

ProtoSmoke® Unit OperationThis diesel locomotive contains a Proto-Sound 2.0 controlled smoke unit that outputs smoke through the smokestack on the roo

Page 9 - (indicates change is made)

After removing the engine from storage, add another 25 drops of fluid, letting the wick soak up the fluid for 15 minutes prior to operation.If you exp

Page 10 - Engine in

Troubleshooting Proto-Sound® ProblemsAlthough Proto-Sound 2.0 has been designed and engineered for ease of use, you may have some questions during ini

Page 11 - Maintenance

RKS SD60 Diesel Engine with PS-219Cab ChatterLock-outVolumeBatteryFYS/PSARemedyRemedyRemedyRemedyRemedySometimes the Cab Chatter sounds don’t play.I c

Page 12 - Grease Idler Gear (G)

Table of ContentsSet UpChecklist...Lubrication...

Page 13 - Truckside Screws

RKS SD60 Diesel Engine with PS-220FYS/PSA RemedyOnce in FYS/PSA, the engine doesn’t go into reverse.When the FYS/PSA enters its last sequence the bell

Page 14

RKS SD60 Diesel Engine with PS-221Additional Features Accessible With The DCS Remote Control System(Additional equipment required)While conventional

Page 15 - Self Charging Battery Back-up

Transformer Compatibility and Wiring ChartProto-Sound 2.0 is designed to work with most standard AC transformers. The chart below lists the many compa

Page 16 - ProtoSmoke® Unit Operation

Service & Warranty InformationHow to Get Service Under the Terms of the Limited One-Year WarrantyWhen you suspect an item is defective, please che

Page 17 - Inspection Cover

Set Up Checklist- Lubricate the locomotive- Check to see whether the battery needs to be charged for full sound effects- Prime the smoke unit- Apply p

Page 18

Priming the Smoke UnitWhen preparing to run this engine, add 15-20 drops of smoke fluid through the smokestack (see Figure 2). We recommend M.T.H. Pr

Page 19

Basic OperationThe Throttle knob controls how fast your train will travel. Turn the throttle knob up ½-way, until the engine and caboose lights shin

Page 20 - FYS/PSA Remedy

Manual Volume ControlTo adjust the volume of all sounds made by this engine, turn the master volume control knob located next to the fuel tank clockwi

Page 21 - Remote Control System

RKS SD60 Diesel Engine with PS-27Proto-Sound 2.0 Operating InstructionsThis manual contains the operating instructions for Proto-Sound 2.0 in conventi

Page 22 - RECOMMENDED AC TRANSFORMERS

RKS SD60 Diesel Engine with PS-28FireRearCoupler=Bell+Sound System Cued to Play Freight Yard or Passenger Station Sounds (FYS)/(PSA)Bell1stSequence FY

Page 23

RKS SD60 Diesel Engine with PS-29Front Coupler:To fire the front coupler (if your engine has one), quickly tap the Bell button once followed by four q

Comments to this Manuals

No comments