Rail King 6-8-6 Steam Turbine Engine Operations Instructions Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
5
RailKing 6-8-6 Steam Turbine Engine
If you choose not to prime the unit
with fluid, turn the smoke unit switch
located under the
engine to the OFF
position (see Figure 5). Running the
engine without a primed smoke unit
may cause damage. See the
“ProtoSmoke Unit Operation” section
of this book for more information on
smoke unit maintenance.
Coupling the Engine and Cars
Our couplers are designed for realistic
operation. Place the engine and cars on
the track and couple them together. If the coupler is already closed, press
down on the small finger that extends from under the right side of the coupler
to open the coupler knuckle and allow the couplers to interlock as shown in
Figure 6.
Insert the reverse unit plug that extends out
of the tender into the receptacle at the back
of the engine. Connect the draw bar
between the engine and tender.
WARNING: DO NOT CONNECT THIS
ENGINE TO A TENDER FROM
ANOTHER ENGINE; IT MAY CAUSE
SERIOUS DAMAGE.
Look at the bottom
of the engine and tender where each will
have a color-coded stamp. If they match
you may connect those two pieces; if not,
don’t.
SMOKE UNIT
ON/OFF SWITCH
Figure 5. Smoke Unit ON/OFF Switch
Push Down on Coupler Finger to
Release Knuckle
Figure 6. Coupling the Freight
Cars Together
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 31 32

Comments to this Manuals

No comments