Rail King 6-8-6 Steam Turbine Engine Operations Instructions Page 1

Browse online or download Operations Instructions for Toys & accessories Rail King 6-8-6 Steam Turbine Engine. Rail King 6-8-6 Steam Turbine Engine Operating instructions [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
RAILKING
6-8-6 BANTAM TURBINE
STEAM ENGINE
OPERATING INSTRUCTIONS
This RailKing 6-8-6 Bantam Turbine Steam Engine is produced in detailed Die-Cast
Metal and operates on O-31 track. This RailKing Steam Engine contains state-of-the-art
electronics with many built-in automatic features for incredibly realistic operation.
Despite these advanced features, the locomotive is easy to operate with any compatible
standard AC transformer (see the compatibility chart on page 18), and is completely
compatible with most other 3-rail locomotives, rolling stock, and accessories.
This locomotive is equipped with Proto-Sound 2.0 with Digital Command System
(DCS). This new system will allow you to operate your locomotive in Command mode
(when used with the DCS Remote Control System, sold separately) or Conventional
mode. Conventional operating features are described in the following pages, while the
DCS operating features are covered in the set of operating instructions that
accompanies the DCS equipment. Conventional Mode operation of this locomotive is
much simpler than operation of original Proto-Sound engines. For your own safety and
that of your equipment, please read the instructions before you operate this engine.
Page view 0
1 2 3 4 5 6 ... 21 22

Summary of Contents

Page 1 - OPERATING INSTRUCTIONS

RAILKING6-8-6 BANTAM TURBINESTEAM ENGINEOPERATING INSTRUCTIONSThis RailKing 6-8-6 Bantam Turbine Steam Engine is produced in detailed Die-CastMetal an

Page 2

10RailKing 6-8-6 Bantam Turbine Steam EngineMaintenance:Lubrication and Greasing InstructionsThe engine should be oiled and greased in order to run pr

Page 3

11RailKing 6-8-6 Bantam Turbine Steam Engine2. Once the boiler is removed, you need to remove the two screws that screwthe PCB bracket to the gear box

Page 4 - Basic Operation

12RailKing 6-8-6 Bantam Turbine Steam EngineProtoSmoke®Unit OperationThis steam locomotive contains a smoke unitthat outputs smoke through the smokest

Page 5 - Button Code:

13RailKing 6-8-6 Bantam Turbine Steam Engine• When the smoke output while running the engine begins to diminish, addanother 10-15 drops of smoke fluid

Page 6 - Freight Yard Sounds (FYS):

14RailKing 6-8-6 Bantam Turbine Steam EngineSelf-Charging Battery Back-UpThe special NiCad 7-cell 8.4v self-charging battery in this engine improvespe

Page 7 - Tips on Using FYS

15RailKing 6-8-6 Bantam Turbine Steam EngineTroubleshooting Proto-Sound®2.0 ProblemsAlthough Proto-Sound 2.0 has been designed and engineered for ease

Page 8 - Speed Control:

16RailKing 6-8-6 Bantam Turbine Steam EngineCab ChatterLock-outVolumeBatteryFYS/PSARemedyRemedyRemedyRemedyRemedySometimes the Cab Chattersounds don’t

Page 9 - Automatic Sounds:

17RailKing 6-8-6 Bantam Turbine Steam EngineFYS/PSA RemedyOnce in FYS/PSA, the enginedoesn’t go into reverse.When the FYS/PSA enters its lastsequence

Page 10 - Maintenance:

18RailKing 6-8-6 Bantam Turbine Steam EngineTransformer Compatibility and Wiring ChartNote that many of the operational commands described in these in

Page 11

19RailKing 6-8-6 Bantam Turbine Steam EngineAdditional Features Accessible with the DCS RemoteControl System:While conventional mode operation of a Pr

Page 12 - Unit Operation

2RailKing 6-8-6 Bantam Turbine Steam EngineTable of ContentsSet Up 3Basic Operation 4Transformer Controls 4Volume Control 4Proto-Sound 2.0 Operation 5

Page 13

20RailKing 6-8-6 Bantam Turbine Steam Engine• Proto-Effects™ Set Up-User can select individual Proto-Effects™ operationsto be active or inactive, incl

Page 14 - Self-Charging Battery Back-Up

21RailKing 6-8-6 Bantam Turbine Steam EngineCAUTION: ELECTRICALLY OPERATED PRODUCT:WARNING: When using electrical products, basic safety precautionssh

Page 15 - Troubleshooting Proto-Sound

Service & Warranty InformationHow to Get Service Under the Terms of the Limited One-Year WarrantyLimited One-Year WarrantyWhen you suspect an item

Page 16

3RailKing 6-8-6 Bantam Turbine Steam EngineSet UpThere are a few simple steps you must take before operating this RailKingsteamer.1. You should prime

Page 17 - Compatibility

4RailKing 6-8-6 Baby Turbine Steam EngineBasic OperationThrottle – Throttle up the power to your track. Give enough power so thatthe engine’s headligh

Page 18 - RECOMMENDED AC TRANSFORMERS

5RailKing 6-8-6 Bantam Turbine Steam EngineProto-Sound 2.0 Operating InstructionsThis manual contains the operating instructions for Proto-Sound 2.0 i

Page 19 - Control System:

6RailKing 6-8-6 Bantam Turbine Steam EngineFreight Yard Sounds (FYS):Your engine is equipped with a sound package of freight yard sounds that youcan p

Page 20

7RailKing 6-8-6 Bantam Turbine Steam EngineTips on Using FYS• You can terminate FYS at anytime by turning off power to thetrack for 15 seconds.• You d

Page 21

8RailKing 6-8-6 Bantam Turbine Steam EngineProto-Coupler®OperationThis locomotive is equipped with a coil-wound Proto-Coupler for remoteuncoupling act

Page 22 - Limited One-Year Warranty

9RailKing 6-8-6 Bantam Turbine Steam EngineLock into a Directional State:You can lock your engine into a directional state (forward, neutral, or rever

Comments to this Manuals

No comments